As the numerous orange cones indicate, construction is going on all over campus, including inside the Schulich library. This mid-sized mammoth recently closed for renovations, and many students have yet to find a new home or place to study (and sometimes cry, too). Although additional study spaces have been unveiled[Read More…]
Tag: McConnell Engineering
Dispatch Coffee sets off for the Plateau with third location on Duluth and St. Laurent
Chrissy Durcak, founder of Dispatch Coffee, holds onto her philosophy of offering accessible quality products as she prepares to open the new store. Though her philosophy remains, the aesthetic of the new location will differ from their current ones: The new Plateau spot will feature a more diversified menu, and[Read More…]
New Engineering Café to open in October
The dining area of the McConnell Engineering building will reopen as a newly renovated food retail location on campus on Oct. 14. While a new coffee location, Dispatch, has already been unveiled right outside the cafeteria, the food court itself has not yet opened. Oliver de Volpi, executive chef of[Read More…]